• (312) 802-5662

A380 Aircraft Accommodation

Chicago Department of Aviation – A380 Aircraft Accommodation

Angelo Construction provided planning, estimating, scheduling and constructability review for the modification to Terminal 5 at O’Hare International Airport to accommodate the new A380 aircraft.

The scope of work included modifications to the building façade, addition of new electronic guidance systems, interior hold room modifications, reconfiguration of passenger fixed walkways and the addition of new passenger boarding bridges to meet the requirements of the dual-level passenger boarding locations of the A380 aircraft.

Read more

American Airlines Gate Swap

Chicago Department of Aviation – American Airlines Gate Swap

Angelo Construction provided planning, estimating, scheduling and constructability review for the modification to existing terminal gates within Terminals 2 and 3 at O’Hare International Airport.

The proposed scope of work includes modifications to the building façade, addition of new electronic guidance systems, interior hold room modifications, reconfiguration and addition of passenger fixed walkways and the relocation of existing passenger boarding bridges at fourteen existing and new gate locations.

Read more

Chicago Department of Aviation

Chicago Department of Aviation

Angelo Construction provides full service construction management services for the Chicago Department of Aviation’s ongoing Capital Improvement Program.  Our services at O’Hare and Midway International airports include design management, construction management, estimating, scheduling, constructability review, and general program planning.

Read more

Metra Englewood Flyover Project

Metra Englewood Flyover Project

Angelo Construction provided field construction oversight of the demolition phase of this project, including removal of existing structures, traffic control on IL Interstate 94 and coordination with the Chicago Transit Authority (CTA).

This project which includes a new Metra bridge carrying 78 weekday Rock Island Line trains over the tracks used by approximately 60 freight and 14 Amtrak trains, is being hailed as a milestone in Chicago rail history as its benefits include: eliminating conflicts between Rock Island, Amtrak and freight trains which are a significant source of train delays, improving air quality for area residents by cutting emissions from idling trains, and eliminating noise from idling trains.

Read more

Midway International Airport Airfield Lighting Control System Replacement

Midway International Airport Airfield Lighting Control System Replacement

Angelo Construction provided construction management services for this project.

The scope of the proposed project included the replacement of the airport’s airfield lighting control system, emergency backup power generator, enhancement to the program logic controls and modifications to the existing electrical switchgear.

Read more

Midway International Airport Passenger Security Bridge Expansion

Midway International Airport Passenger Security Bridge Expansion

Angelo Construction provided budgeting, schedule and constructability review services during the planning and design phases of this project and will provide project management /construction oversight services as the project is constructed.
Scope of work includes the widening of the existing passenger bridge to the north and south as a means to accommodate current and future pedestrian traffic flow. This project increases the area available for passenger queuing to 80,000 square feet. The existing Checkpoint will be relocated onto the bridge creating an additional 12,000 square feet for potential revenue generating areas adjacent to the existing food court.

Read more

Midway International Airport Terminal Parking Garage Expansion

Midway International Airport Terminal Parking Garage Expansion

Angelo Construction provided budgeting, schedule and constructability review services during the planning and design phases of this project.
The scope of the proposed project includes a 4-level vertical extension of the existing terminal garage over the adjacent CTA rail yard property. The approximate size of the expanded parking structure is 650,000 square feet and provides approximately 1,500 additional parking spaces. In addition, the existing parking structure mechanical, electrical, plumbing, fire protection, elevators and call station systems will be upgraded to achieve a fully integrated parking structure.

Download Parking Garage Exhibit

Read more

O’Hare ATS Expansion and Modernization

O’Hare ATS Expansion and Modernization

As a subcontractor to Parsons , Angelo will assist in the oversight of the construction of the O’Hare International Airport’s Automated Transit System (ATS) modernization program under a $310 million contract with the Chicago Department of Aviation.

The ATS modernization involves replacement of the existing ATS between terminals and a 2,000 ft extension to service the new consolidated rental car station as well as expansion of the maintenance and storage facility and replacement of the existing 15 vehicle fleet with 36 new rail cars with automated vehicle control, traction power, and communications improvements. It also includes the design for the traction power, communications, and track work while performing systems integration and commissioning work for the entire project.

Read more

United Airlines Gate Additions

Chicago Department of Aviation – United Airlines Gate Additions

Angelo Construction provided planning, estimating, scheduling and constructability review for the modification to existing Terminal 2 at O’Hare International Airport to accommodate additional gates.

The proposed scope of work includes an expansion of the existing Terminal 2 as well as modifications to the existing building façade, addition of new electronic guidance systems, interior hold room modifications, reconfiguration and addition of passenger fixed walkways and the relocation and additional of existing passenger boarding bridges.

Read more