Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c01/h02/mnt/8207/domains/angelo-cs.com/html/wp-content/plugins/revslider/includes/operations.class.php on line 2260

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c01/h02/mnt/8207/domains/angelo-cs.com/html/wp-content/plugins/revslider/includes/operations.class.php on line 2264

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c01/h02/mnt/8207/domains/angelo-cs.com/html/wp-content/plugins/revslider/includes/output.class.php on line 2867
Midway International Airport Airfield Lighting Control System Replacement – Angelo Construction Services, Inc.
  • (312) 802-5662

Midway International Airport Airfield Lighting Control System Replacement

Midway International Airport Airfield Lighting Control System Replacement

Angelo Construction provided construction management services for this project.

The scope of the proposed project included the replacement of the airport’s airfield lighting control system, emergency backup power generator, enhancement to the program logic controls and modifications to the existing electrical switchgear.